Consists of a door switch roller plunger or magnetic reed style a time delay and line voltage or 24 volt control.
Berner air curtain door switch installation.
Maxair zephyr series air curtain.
How to video on how to properly install a berner industrial air curtain and then set the air stream for the most effective air seal.
Remove the required knockout if it has not already been done and connect the power supply to the air curtain.
The top of the air curtain has two knockouts on each side of the air curtain allowing for a left hand or right hand power connection.
For optimum performance the bottom of the air curtain discharge nozzle should be no more than 1 above the top of the door opening with the air curtain s mounted flush to the wall.
Maxair air conditioner pdf manual download.
Zephyr maxair max1030 maxair max1036 maxair max1042 maxair max1048 maxair max1060 maxair max1072.
If the air curtain must be mounted higher it must be spaced out from the wall 3 8 for every inch the air curtain is above the door opening.